Texas Onsite

Infrastructure Design, Civil Engineering, OSSF Design, OSSF Permit

Home

About Us

Civil Design

Wastewater Treatment

Residential Wastewater

Residential

Residential System

Site Visit

Design Phase

Permit Review

Construction

Inspections/Troubleshoot

Failing System HELP

Comm'l/Industrial WW

Commercial

Commercial Process

Underwater

Infrastructure

Contact Us

Usefull Links

Design Phase
 

The next step in the process, after the Site Visit, is the Design Phase.

 

The following items are performed during the Design Phase:

  • Determine System Hydraulic Loading (flowrate)
  • Determine System Type
  • Perform Design calculations, based upon system type.
  • Determine biological loading rate (if necessary, based upon use).
  • Draft Design Drawings, showing system layout on the lot, component details, and other items required by Regulatory Authority.
  • Assist Property Owner in gathering required paperwork for the permit.
  • File required Affidavits, and file for permit with Regulatory Authorities.

septic engineering septic design septic permit lcra travis hays austin round rock leander burnet
Site Design and Engineering
CAD autocad septic engineering septic drawing
Full Size Engineering Plot
 
Texas Onsite...brought to you by AusTex Development. Copyright 2006-2011. All rights reserved. No part of the content of this site may be copied or reproduced without written permission from the Owner.