Texas Onsite

Professional Engineering and Construction Services

Home

About Us

Septic Inspection

Septic Permits

Residential Septic System

Residential

Residential System

Site Visit

Septic Design

Septic Engineer

Septic Permit Review

Construction

Inspections/Troubleshoot

Failing System HELP

Wastewater Treatment

Comm'l/Industrial WW

Commercial

Commercial Process

Civil Design

Buildings

Commercial Septic

Infrastructure

Underwater

Contact Us

Usefull Links

Site Visit
 

The site visit is when the Engineer visits the site.

During this visit, there are a variety of tasks that are done, pending the design:

  • Do a rough layout of the buiding(s).
  • Establish setback distances for such things as water wells, ponds/streams, property lines, easement setbacks, etc.
  • Perform a soil profile analysis. This involves digging a series of holes in the proposed field area, and classifying the soil, per the USDA Soil Classification System. Our firm is certified to perform these tests. The soil profile is important, as it establishes important characteristics of the soil, the presence of water (if any), and leads to ultimate field sizing of the system.
  • Establish site elevations (topographic information) for the design.
  • Do staking of the proposed system, for a site visit by the Permit Authoritys (they visit the site, during the design review phase).

replace existing septic tank austin westlake travis williamson hays blance burnet comal
Replacement System Installation
septic drip irrigation
Completed System Retrofit (field is in background)
 
Texas Onsite...brought to you by AusTex Development. Copyright 2006-2013. All rights reserved. No part of the content of this site may be copied or reproduced without written permission from the Owner.

Website powered by Network Solutions®